![]() ![]() Installations of this type can vary depending on the necessary internal modifications required. Installation of an ejector pit and pump(s) to lift the building sewage above the elevation of the sewer main in the street provides a means of positive protection. Modifications of the plumbing inside the home to an overhead system can dramatically reduce the possibility of the backup of sewage into the home or basement when the sewer system is overloaded. While no sewer is immune to backup, the most reliable method for protecting private property from sewer backup is through the installation of a BCV or OSS. The goal of this program is to provide protection against the sewer backups into homes. The Village however has over fifty miles of pipe in the ground, some which dates back to the 1920s, and it is unfortunately not feasible to separate all sewer systems in every location. Since the 1990s the Village has invested millions of dollars to improve its sanitary and combined sewer system, by installing new relief sewers, and separating the combined sewer system, whenever possible. Many older homes in the Village have gravity sewer systems that can back up when the Village's main line combined sewer surcharges. The program allows owners of single-family detached homes to be reimbursed up to 50% of the cost, or $5,000 (whichever comes first) to install a BCV or OSS. The Village of Western Springs has developed a cost share program for owners of detached single-family residential structures who participate in the installation and/or retrofit of a backwater check valve (BCV) or overhead sewer system (OSS). ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |